Visakhapatnam steel plant

Year: 2013
  • Unit location: г. Vizakhapatnam, Andhra Pradesh, India
  • ТUnit type: Integrated Steel Plant
  • Capacity: 3.4 million tons of steel p.y.

Sinter plant №3 construction with capacity rating to 3.611 MTPA of sinter with sintering area of 408 m2.

The construction is being performed within frames of the Steel Plant expansion program with increase of capacity up to 6.3 MTPA of steel.Sinter Plant is to provide Blast Furnace № 3 of 3200m3 volume commissioned in 2013 with sinter. The construction is being performed on “turn-key” basis in conformity with the Contract, signed on the results of tender dt. 01.05.2007 between Visakhapatnam Steel Plant and the consortium consisting of JSC “VO “Tyazhpromexport”, Russia (the Leader) and McNally Bharat, India (the supplier of Indian equipment and services).

The Customer Consultant is the M.N.Dastur and Co.(P) Ltd. company, Kolkata, India. JSC “VO “Tyazhpromexport” scope of work includes the supply of the Design & Engineering and the main technological equipment, supervision and management of the construction, erection, tests, start up and commissioning of the Project as well as Indian operating personnel training.

Subcontractors of JSC “VO”Tyazhpromexport” are as under:
The State Enterprise “UkrGipromez”, Dnepropetrovsk, the Ukraine, the General Designer of the Sinter Plant; JSC “Heavy Engineering ORMETO-YUMZ”, Orsk, Russia –the designer and the supplier of the sintering machine, mixer , nodulizer and crusher; “Siemens Vai Metals Technologies Gmbh & Co.”, Linz, Austria –the designer and the supplier of the ring cooler; “Howden UK Ltd.”, Belfast, England – exhauster supplier; “Tecno Vibrazioni Venanzetti”, Milan, Italy – the supplier of sinter screens.

The main guarantee parameters are the following:

  • Daily average output (within 3 days) – 10 950 t/24h
  • Max. output (within 24 h) – 13 190 t/24h
  • Fuel consumption – not over 60 kg/t of sinter
  • Dust emission into the environment at exhaust outlet – not over 50 mg/nm3
  • Dusting in the working area – not over 5 mg/nm3
  • Noise level 3 m from equipment – not over 85 decibel
  • Equipment erection was completed in 2013.